Location: Orondo, Washington
Contractor: Timberwood Construction
Completion Date: Fall 2019
The owner’s father started, but did not complete, construction of a house on this site in the 80’s. The remodel and addition included adding a garage and reconfiguring several elements such as the kitchen and entry (as well as a completely new roofline), and turning what was a single level living room facing the river into a double-height space with a loft connection to the second floor and expansive views across the new covered deck toward the river. Without adding substantial square footage, the space feels larger and more functional.
Photos by Dzhan Wiley








